Historical product sample · captured August 11, 2026

What a useful signal looks like.

These examples show the evidence boundary and decision format. Dates and status are a historical sample, not current sales instructions; paid reports retrieve live sources at run time.

ACT

880 McAllister Street

100% affordable senior housing with ground-floor commercial space

90/100

VERIFIED PUBLIC FACTS

  • Permit 202505156557 was issued July 1, 2026
  • 7 stories · 115 units · roughly 104,000 sq. ft.
  • $70,000,000 stated permit valuation
  • Contractor: Guzman Construction Group Inc.

DataSF permit source

AI / RULE INFERENCE · 86% CONFIDENCE

Probable classes: earthmoving, compaction, pumps, dust control, temporary power; later material handling and aerial access.

Action: Verify actual mobilization and ask the responsible business contact about two-to-six-week fleet gaps. Do not claim an unmet need.

ACT

772 Pacific Avenue

100% affordable senior housing

88/100

VERIFIED PUBLIC FACTS

  • Permit 202512151804 was issued June 17, 2026
  • 15 stories · one basement · 175 units
  • $105,000,000 stated permit valuation
  • Contractor: Cahill–Pilot Joint Venture

DataSF permit source

AI / RULE INFERENCE · 82% CONFIDENCE

Probable classes: compact sitework equipment, pumps, compaction, temporary power, telehandlers, and aerial access.

Action: Verify current phase, then qualify urban delivery constraints and overflow or replacement capacity.

ACT

506 China Basin Street

Mission Bay South Block 4E Phase 1

87/100

VERIFIED PUBLIC FACTS

  • Permit 202512161871 was issued June 26, 2026
  • 16 stories · 165 residential units · two parking levels
  • $57,776,592 revised permit valuation
  • Contractor: Swinerton Rubecon Joint Venture

DataSF permit source

AI / RULE INFERENCE · 80% CONFIDENCE

Probable classes: earthmoving, compaction, pumps, generators, material handling, and aerial access.

Action: Qualify current phase, delivery constraints, and two-to-eight-week fleet gaps with the responsible business contact.

Score meaning: prioritization quality, not close probability. Stage/timing, contact actionability, freshness, fleet fit, stated scale, source quality, and explicit penalties are scored separately.